OES Teamwork
The rig is a 3000HP swamp drilling barge equipped with 10,000 psi BOP systems and can drill up to 25,000 ft deep wells.
OES Teamwork commenced drilling operations with NAOC in 2010 and carried out workover/drilling operations on 19 wells which included exploratory, development, re-entry, sidetrack & completion jobs.
The rig followingly began its drilling campaign with the NPDC/Elcrest JV in 2017 on the OML 40 project and was able to successfully deliver 10 wells in effectively 23 months.
Numerous equipment upgrades & maintenance including brand new Top Drive System, Mud Pumps, Power Generators among others have recently been installed on the OES Teamwork.
See attached brochure for rig specification summary.